As part of a £3.3m development, NRT carried out the electrical refurbishment for the Leisure Centre at Cheam on behalf of the Main Contractor, R Durtnell & Sons, and the client.

The initial works of isolation and strip out, cleared the way for the main works to renovate the existing pool hall lighting along with surrounding offices, stores and changing rooms. Additional accessible WC’s were installed at both ends of the building, requiring new power and lighting to accommodate the specialist equipment within.

Whilst the main Pool Hall area lighting had generally been designed by the consultant, additional design was required to enhance the structural aspects of the installation to accommodate the existing structural elements of the roof, along with anti-corrosive coatings of powder coated PPC metal work.